REQUIRES LOWER MANHATTAN BOROUGH COMMISSIONER'S OFFICE (LMBCO) REVIEW. The New York City Department of Transportation (NYC DOT) has adopted specifications and regulations stipulating how street work must be performed in order to minimize disruption and maintain the integrity of the street surface. The requested permit must be appropriate for the type of work that is planned. 1FTRES-RESTORE AS PER SKETCH #9 OD DOT'S PROTECTED STREET RESTORATION REQ'MENTS. The purpose of placing a street in protected status is to maintain the integrity of a new street surface. FULL WIDTH OF ROADWAY NOT REQUIRED DURING CONCRETE CURING PERIOD. POSTING OF SIGNS ON MTA/NYCT ANTENNA POLES IS PROHIBITED. Tel: (212) 669-7817 WORK INCLUDES TREE PIT & MAY INCLUDE NEW CURB,REQUIRED ROADWAY REPLACEMENT AND SIDEWALK REPLACEMENT. Any emergency work on a street that involves opening a utility access cover to gain access to an underground facility on a critical street during restricted hours requires an EAN. NO WORK EXCEPT FOR EMERGENCY WORK MAY OCCUR. LOCAL AND EMERGENCY ACCESS MUST BE PROVIDED FROM EACH END OF THE BLOCK AT THE INTERSECTIONS WITH USE OF FLAGGERS AND SIGNAGE. After the canopy passes final inspection, HIQA will release the hold and the applicant must return to the Permit Office to obtain the permit to maintain the canopy. Further information on responding to Orders may be found in the Highway Rules, Section 2-02(e). ALL PERMITS MUST BE ON SITE. (212) 839-2475 The Highway Rules, Section 2-07(c) (4) contains additional information. FULL BUILDING LINE RESTORATION IS REQUIRED FOR WIDTH OF THE ROADWAY. From a block party, which opens a single block to community activities for a day, to Summer Streets, which dedicates over 7 miles of streets to pedestrians, runners, and cyclists, programming reminds New Yorkers that streets are public space, and should support active, healthy, and sustainable lifestyles. LANE CLOSURES MAY NOT OCCUR WHEN TWO LANE CLOSURES OCCUR ON GOWANUS OR ON RAMPS LEADING TO 3RD AVENUE. 130 Stuyvesant Place, 6th Fl. Emergency work will not be placed on hold and shall proceed in accordance with Highway Rules, Section 2-11 (g). Street lights and signals at corners must be sited so that they do not obstruct pedestrian ramps, ensuring sufficient access to the sidewalk for all pedestrians, including those using mobility devices. Attn: Forestry MUST CONTACT NYSDOT ENGINEER IN CHARGE NIGHTLY TO COORDINATE. Based on the documents submitted, HIQA makes a preliminary determination as to whether the proposed location may be suitable for a canopy. The term "street" means a public street, avenue, road, alley, lane, highway, boulevard, concourse, parkway, driveway, culvert, sidewalk, crosswalk, boardwalk, viaduct, square or place, except those streets adjacent to any waterfront property designated as a marginal street on a city map. Canopy design and construction must be in accordance with NYC DOT Standard Details of Construction. StatenIsland.Forestry@parks.nyc.gov CONTRACTOR MAY CONTAIN A MAXIMUM OF 25 LINEAR FEET, 8 FEET ADJACENT TO THE CURB DURING NON-WORK HOURS. Questions regarding permit registration or application processes can be directed to any Permit Office. If the installed canopy fails final inspection, HIQA will reject the canopy maintenance permit and notify the applicant of the rejection. NO EXCAVATION OR NOISY OPERATION PERMITTED DURING THIS TIME PERIOD. Staten Island, NY 10301 The Poles and Luminaires chart identifies which combinations of poles and luminaires are permitted. WORK HOURS ARE EASTBOUND 7 AM TO 3 PM OR WESTBOUND 10 AM TO 4 PM, MONDAY THROUGH FRIDAY, WORK MONDAY TO FRIDAY 10 AM-4 PM, SATURDAYAND SUNDAY, WITH NO NOISY OPERATIONS AFTER MIDNIGHT. (NAME AT LEAST 2). ALL CLOSURES ARE CONFINED TO 15 FEET TO THE NEW EAST CURB LINE. Further information on permits is available in Chapter 3 Permits and Approvals. The Bronx A table showing the agencies that must be contacted prior to applying for certain NYC DOT permit types can be found in, If the applicant intends to work on a contract that has been awarded by a government agency or authority, the applicant must bring a copy of the contract, Order on Letter, Notice to Proceed or a Letter of Authorization. A statement of the basic construction details including type, description and color of the canopy covering; type, diameter and gauge of all supporting members; description of the frame, wind bracing assembly and sidewalk and building fastenings; description of proposed lettering on the canopy covering including exact wording and dimensions thereof; three 5 inch by 7 inch photographs of the proposed site. If the applicant does not agree with the PM, he or she is informed of the appeals process. CONTRACTOR/PERMITTEE IS REQUIRED TO POST AND MAINTAIN ADVISORY SIGNS A MINIMUM OF48 HRS PRIOR TO CHANGING EXISTING PARKING REGULATION SIGNS TO APPROVED TEMPORARY CONSTRUCTION PARKING REGULATION SIGNS. The organization of the Street Works Manual generally follows the chronological process of planning and undertaking work in the street. If there is no hold, the permit is issued to the applicant after appropriate payment is received. The construction, alteration or repair of any building vault or transformer vault requires a permit from NYC DOT. Five types are relevant to the citys street lights: I, II, III, IV, and V. Standard Street Light: Standard pole (Octagonal) with LED Cobra Head luminaire. To request release of a CAN hold, the applicant must contact the HIQA borough office in the borough in which the canopy is installed to arrange for a final inspection following canopy installation. MAINTAIN A 5-FOOT CLEAR SIDEWALK WHEN WORKING ON THE ROADWAY AND A 5-FOOT PROTECTED PEDESTRIAN WALKWAY IN THE ROADWAY MEETING NYCDOT SPECIFICATIONS AND RAMPED AT ENTRY TO SIDEWALK FOR HANDICAPPED ACCESSIBILITY WHEN WORKING ON THE SIDEWALK. The first and most expeditious option (see Diagram 2), is by using the DOT on-line NYCStreets Permit Management system. Office hours: Applications accepted, only from 8:00 AM to 11:30 AM; MAINTAIN 5' SIDEWALK AT ALL TIMES. View the, Applicants must obtain all applicable original permits and/or approvals from any other governmental agencies prior to applying for a permit. The area of the sidewalk closest to the curb, where light poles, tree pits and other vegetation, signs, fire hydrants, and street furniture are typically located, is referred to as the furnishing zone.. NO NOISY WORK 10 PM TO 7 AM M-F, 10 PM FRIDAY TO 8 AM SATURDAY, 10 PM SATURDAY TO 9 AM SUNDAY AND 10 PM SUNDAY TO 7 AM MONDAY. Name, address and phone number of excavator, Brief description of the planned digging and excavation. If a permit application includes permit requests to work on embargoed streets within 90 days prior to the start of the HE (November 16th), the permittee will be presented with a warning, during the application process, stating that such permit request(s) will be subject to the upcoming HE. Office hours: 8:30 AM-3:30 PM (in person) Check each borough in which the applicant expects to work. VIOLATORS SHALL BE FINED AND PERMITS WILL BE SUSPENDED FOR NON COMPLIANCE. Under the surface, the same streets support the city's water, sewer, power and telecommunications infrastructure, as well as its subway tunnels and building vaults. Once Finance contacts HIQA, the hold(s) will be released. FIVE OR MORE SPEED REDUCERS ARE LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA. THIS STIP IS USED FOR WORK IN NUMEROUS LANES BUT NOT FOR THE ENTIRE LENGTH OF THE BLOCK. BEVELED SAWCUT IN ROADWAY. Outlined below are the basic application procedures for Building Operations/Construction Activity Permits. If the permit has been expired for more than30 days, a new permit application must be submitted. Registration applications should be printed on 8 1/2"x 14" paper. PRIOR TO BEGINNING ANY WORK, YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. Fax: 718-584-8628, Brooklyn 30-30 Thomson Avenue, 4th Floor Fax: (212) 669-3844, New York City Office of Emergency Management (OEM) All construction-related permits have expiration dates.
NJDOT Engineering - State TWO SPEED REDUCERS ARE LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. If the proposed work location is in protected street status, the application will automatically be placed on SAM hold for further review. For Holds: (212) 748-6609 Programming activates roadways, sidewalks,and pedestrian plazas, andis essential to the ongoing success of any public space. When the license is issued, the applicant must pay a one-time license fee of $2 per square foot. A Sidewalk Violation will be removed if the work has been satisfactorily completed. THE TRAFFIC STIPULATIONS ON THIS PERMIT DO NOT GO INTO EFFECT AS LONG AS THE CONTRACTOR CONTINUES TO WORK NON-STOP, AROUND THE CLOCK, TO CORRECT THE EMERGENCY SITUATION. ALL WORK TO MEET OR EXCEED NYC DOT STANDARDS. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Failure to comply with an order issued by the Commissioner may result in criminal or civil penalties. SECTION 7: AUTHORIZED REPRESENTATIVES TO OBTAIN PERMITS. In order to maintain world-class streets, permits must be obtained for the work performed in the street. THIS PERMIT MAY BE EXTENDED ONCE ONLY, FOR A PERIOD OF 14 DAYS AT $40. MUST MAINTAIN SAFE PASSAGE FOR PEDESTRIANS. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. THIS SEGMENT IS PARTIALLY DESIGNATED LANDMARK. 1400 Williamsbridge Road, 1st floor MUST TINT CONCRETE TO MATCH ASPHALT. ODTRES-RESTORE AS PER SKETCH#10 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. POST SIGNS MEETING NYCDOT SPECIFICATIONS FOR DIRECTING PEDESTRIANS TO OPPOSITE SIDEWALK. Fax: (718) 430-4663 While the situation is evolving, the agency remains committed to applying the principles and proven treatments included in the Street Design Manual to support the health and safety of all New Yorkers. Learn about ParkNYC. Brooklyn.Forestry@parks.nyc.gov Street Opening, Building Operations/Construction Activity, Sidewalk Construction, and Canopy Permits are reviewed and stipulated by OCMC staff. Applications for renewal of a canopy maintenance permit must be made at least one month prior to the permit expiration date and must be submitted to the Permit Office in the borough in which the canopy is located. NYC DOT may revoke or refuse to renew a permit for any of the reasons listed below. Connecticut Department of Transportation Division of Traffic Engineering Email: DOT.TrafficElectrical@ct.gov. See, Utilize recycled content in paving materials. IF WORK IMPACTS THE STATION, THE PERMITTEE MUST CONTACT NYC BIKE SHARE AT 855-245-3311 FOR THEIR REQUIREMENTS PRIOR TO WORK. To request release of an STP hold, the applicant must contact the HIQA borough office in the borough in which the proposed work is to be performed. This New York 811 marking shows where a cable television line is located beneath the sidewalk. APPLICANT INFORMATION (JOINT VENTURE), 1D. Click here for a copy of the Instructions for Permittee Registration Application. ON STIP 109). 30-30 Thomson Avenue, 4th Floor THE CONTRACTOR IS RESTRICTED FROM REMOVING ANY STREET FURNITURE FOR THE INSTALLATION OF TREE PITS. 16 Court Street, 16th floor SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Any of these holds will prevent a permittee from applying for new permits: New York City Department of Finance (DOF or Finance) hold If a permittee has failed to pay previously issued summonses/Notices of Violation (NOVs) to the New York City Environmental Control Board (ECB), all future permit requests may be placed on hold until the fees associated with the outstanding summonses/NOVs are paid. PERMITTEE IS AUTHORIZED TO RESTRICT PARKING IN FRONT OF WRK ZONE & ALONG THE OPPOSITE CURB LN OF WRK ZONE USING NYPD PAPER SIGNS STATING DAY(S) OF WRK. The pedestal is monolithically poured with the foundation. If a permit is about to expire and the permittee has not completed the work, the permittee must apply for a permit renewal as all work must be performed pursuant to an active permit at all times. The applicant will also be notified of any corrective action necessary and recourses available. Executive (EXC) hold An EXC hold is automatically placed if the proposed permit locations involve locations deemed necessary by NYC DOT. If guide sheets are to be included in a project, they should be included in a subset under that project. Traffic Engineering Standard Drawings Standard Sheets. MeetingsRegular coordination meetings allow decision makers to share information and to discuss project difficulties and constraints. All other inquiries: (212) 748-6610 Tel: (718) 482-4825. This category of permits applies to authorizations and permits required to place a canopy* over the sidewalk. Bronx, NY 10457 These holds can only be released by HIQA: Cobblestone (COB) hold All permits issued to work on a cobblestone street are automatically placed on hold until a HIQA inspector performs an inspection of the work site to establish existing conditions before work begins. WORK ALLOWED 8 PM TO 6 AM NIGHTLY. Registered Permittees may apply, pay for and print their permits anytime anywhere using the NYCStreets Permit Management online system. Fax: (718) 815-8391. All other times: (718) 433-3447, The Bronx and North Queens (north of the Long Island Expressway) NYC DOT project locations, protected streets, and other maps are available online at the Department of Information Technology & Telecommunications (DoITT) NYCityMap website and the DOTMap portal. Applicants should contact the NYC DOT Plan Examination Unit (PEU) of the Permit Office to initiate the application process and to determine specific requirements for a permit and a license, if required. SPECIFICATIONS. Minimum slopes should be used wherever possible. WORK 10 AM - 7 PM, MONDAY THROUGH FRIDAY. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR RESTORATION OF CUT CONFINED TO WITHIN 8 FEET OF THE CURB LINE IN ACCORDANCE WITH NYCDOT RULES AND REGULATIONS FOR PROTECTED STREETS.
Drawings - New York State Department of Transportation There are nearly 6,000 miles of streets in New York City. This chapter describes the different types of permits that are issued by the New York City Department of Transportation (NYC DOT), the one-time permittee registration process, the application procedure for each permit type, and special circumstances and procedures. 66 John Street, 10th Floor VARIANCE GRANTED TO WORK DURING SCHOOL HOURS AS STIPULATED BY O.C.M.C. 16 Court Street, 7th Fl. Contact information pertaining to the release of holds by NYC DOT can be found in Appendix C, NYC DOT Contact Information. NYC DOT issues permits for two types of vaults: building vaults and transformer vaults. 2. It also covers installations above the street such as banners and decorative lights and permanent installations on the street such as bike racks. ALL WORK MUST BE PREAPPROVED BY LANDMARK PRESERVATION COMMISSION. Borough Permit OfficesIn-person applications for all other construction-related work can be submitted to the borough office in the borough in which the work is to be performed. THIS PERMIT REQUIRED AN ODV PERMIT WHICH MUST BE IN THE VEHICLE FOR INSPECTION BY A POLICE OFFICER AND OR AUTHORIZED GOVERNMENTAL EMPLOYEE UPON REQUEST. OFF-SITE STORAGE MUST BE PERMITTED SEPARATELY. For conditions that need immediate attention from the permittee, NYC DOT may issue Priority CARs [AKA Notices of Immediate Corrective Action (NICAs)]. THIS PERMIT ACTIVITY MAY NOT START UNTIL THE PERMITTEE COORDINATES ALL WORK WITH ANY ONGOING CONSTRUCTION & WITH THE PROJECT/RESIDENT ENGINEER FOR ANY ONGOING CAPITAL PROJECTS. NYC Parks & Recreation
Street Works Manual Listed on the following page are the most commonly requested Street Opening Permit types which may be used when completing an application. If there is no hold, the permit is issued to the applicant after appropriate payment is received. New York State Department of Transportation coordinates operation of transportation facilities and services including highway, bridges, railroad, mass transit, port, waterway and aviation facilities . An application for a Street Opening Permit on a protected street will automatically be placed on a Street Arterial Maintenance (SAM) hold if the proposed work is to start within 18 months of the street being resurfaced or reconstructed. A one-time Street Opening Permit must also be obtained to install the poles that support the canopy. Print his/her name and title and provide a signature. NYC Parks & Recreation NYPD AGENTS AND VMS BOARDS REQUIRED AS PER MEC01-36. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR FULL INTERSECTION RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. Signs must be conspicuously displayed and face the nearest curb line. Tel: (718) 482-4516 COLORED ROADWAY AND OR SPECIAL MARKINGS ARE LOCATED ON THE ROADWAY OF YOUR PROPOSED WORK AREA. THIS STIP IS USED FOR WORK CROSSING THE ROADWAY OR FOR BPP RESTORATIONS THAT FALL OUTSIDE OF THE HALF PLUS FIVE RULE. New York State law (Article 36 of General Business Law and 16 NYCRR Part 753, AKA Industrial Code 53) requires excavators to contact New York 811, via 811, 800-272-4480 or the internet, within 2 to 10 working days before performing any digging or excavation work. A CRIA statement is required if the closure is expected to last for more than 180 consecutive calendar days, as set forth inSection 2-16 of the Highway Rules. By mutually sharing data before detailed construction plans have been developed NYC DOT and street excavators can adjust their project plans to avoid conflict and maximize the potential opportunity for street work coordination. MAY ALSO CLOSE SIDEWALK ON NORTH SIDE FRONTING DEVELOPMENT. THIS PERMIT INCLUDES THE OCCUPANCY OF THE ROADWAY AND OR SIDEWALK BY BARRIERS FOR THE PURPOSE OF SAFETY AND PROTECTION SURROUNDING THE OPEN UTILITY COVER WHILE MAINTAINING A SHUNT. MAINTAIN 1 LANE IN EACH DIRECTION FROM 9AM-4PM M-F AND 9AM-6PM SAT/SUN. WORK HOURS ARE 7 AM - 8 PM MON-FRI AND 9 AM - 6 PM SAT. The streets themselves also serve as public spaces, fostering social, economic and recreational activities. 211th Street and 23rd Avenue, Queens Riverside Drive, Manhattan Benefits Enhances pedestrian safety and accessibility by reducing crossing distances and providing refuge for pedestrians to cross road in stages Calms traffic, especially left turns and through-movements, by narrowing roadway at intersection 350 St. Marks Place, Main Floor SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. The construction of any vault that extends beyond the curb must be authorized under a revocable consent agreement, as required in Section 2-13(c) of the Highway Rules, in addition to approval by PEU. More specific information on each permit type, including application procedures and fee structures are described in greater detail in Section 3.3 The Permit Application Process of this chapter. This is discussed in greater detail under Section 4.3 Street Restoration Requirements, and in theSections 2-11(e)(15), 2-11(e)(16) and 2-11(f) of the Highway Rules. Private property owners are responsible for installing, repairing and maintaining sidewalks abutting their properties. (212) 748-6670 Department of Transportation. IES classification of lighting based on its photometric properties. Poles (POL) hold A POL hold is automatically placed if the proposed permit work is for the installation of a pole on the sidewalk, which must be reviewed, approved and released by NYC DOT Street Lighting. RESTORE ALL TRAVEL LANES WHEN SITE IS UNATTENDED CONTRACTOR MAY CONTAIN A MAXIMUM OF 25 LINEAR FEET, 8 FEET ADJACENT TO THE CURB DURING NON-WORK HOURS. Access the, If the applicant intends to fully close a roadway, a. In some cases, applications and supporting documentation must be submitted in person. If the hold is not released, the applicant must contact the borough ASHO to determine the feasibility of the work being completed prior to the final resurfacing. MUST MEET ALL REQUIREMENTS AS SET FORTH IN RTE 9A RECONSTRUCTION PROJECT REPAIR DETAILS FOR REPLACEMENT OF 50 YEARS CONCRETE PAVEMENT AND SIDEWALK DATED 9/7/2001. The applicant may apply directly for this permit type without being a registered permittee, provided he or she can demonstrate proof of required insurance. These forms may also be found inAppendix B, Forms. The NYC Street Works Manual describes policies governing work on city streets, and presents procedures for notice, approval and execution of such work. Applicants may provide complete copies of insurance policies instead of certificates of insurance. Telephone inquiries: 8:30 AM-4:30 PM, Staten Island MAY BE INTERMITTENTLY CLOSED TO THROUGH TRAFFIC WITH THE USE OF FLAGGERS WHILE PROVIDING LOCAL ACCESS AT ALL TIMES FOR A MAXIMUM OF 90 MINS. THIS WORK HAS PRIORITY OVER OTHER NON-EMERGENCY WORK ON STREET SEGMENT. The applicant must maintain valid insurance and a canopy maintenance permit as long as the canopy exists. 10 Richmond Terrace SUMMER RELIEF SYSTEM UPGRADE. Payment by an applicant of outstanding fines, civil penalties or judgments imposed or entered against such applicant by a court or ECB; Payment by an applicant of outstanding fees or other charges lawfully assessed by NYC DOT against such applicant pursuant to the Highway Rules or other applicable law; and/or, Satisfactory compliance by an applicant with a CAR or order issued by the Commissioner. Brooklyn, NY 11211 Permeable Interlocking Concrete Paver (PICP), Provides space for walking, the most widely used mode of travel in New York City, Creates linkages to transit and connects neighborhood destinations, Facilitates straight and unobstructed pedestrian movement, free of vehicle conflicts except at intersections and driveways, With adequate width, can provide space for staying activities such as relaxing, shopping, eating, and socializing, Coordinate streetscape/utility work to minimize street cuts, On both sides of all streets that are 22 feet wide or wider. Once the canopy installation permit application has been reviewed and approved by the Permit Office, the permit is issued to the canopy installer or authorized agent, and canopy installation can begin. Clicking on the "i" button at the top center of the map will change the cursor into an arrow with an "i" next to it. A street is considered to be protected for five years from the date it was last resurfaced or reconstructed. (718) 391-1110 3.1 General Provisions For Construction-Related Permits MAY WORK 24/7, OCCUPY CURB LANE, ALL EQUIPMENT, STORAGE OF MATERIAL ALLOWED. NYC DOT Standard Highway Specifications, May 16, 2022 NYC DOT Standard Details of Construction, June 6, 2022 Sewer and Water Main NYC DEP Standard Sewer and Water Main Specifications, August 8, 2022 NYC DEP Specifications for Trunk Main Work, July 2014 NYC DEP Water Main Standard Drawings, December 2020 NYC DEP Sewer Design Standards, August 2018 One call to New York 811 provides for where gas (yellow), electric (red) and phone (orange) are located. Tel: 212-720-3480 New York, NY 10007-1216 Additional requirements are contained in Sections 2-02 and 2-05 of the Highway Rulesand should be consulted before any work is performed on the street. DOT's preference is that there is no split in Pedestrian Flow. NYC DOT has a separate procedure for obtaining permits for emergency street opening/excavation work so that applicants can expeditiously obtain such permits. The screen image below displays the "NYC DOT 10 year Capital Plan" projects in green and protected streets in blue. The city has master revocable consent agreements with electric utility companies that allow them to occupy and use city property for transformer vaults. CNRRES-RESTORE AS PER SKETCH #6 OF DOT'S PROTECTED STREET RESTORAITON REQ'MENTS. Existing InfrastructurePermittees must not remove parking meters, traffic signs, street lights, street furniture, and similar items unless authorized on the permit. PERMITTEE MUST EMAIL DEP AT. Brooklyn, NY 11211 This chapter describes the different types of permits that are issued by the New York City Department of Transportation (NYC DOT), the one-time permittee registration process, the application procedure for each permit type, and special circumstances and procedures. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN, ALL TEMPORARY TRAFFIC CONTROL DEVICES, INCLUDING BUT NOT LIMITED TO SIGNS, CHANNELIZING DEVICES, FENCING AND MARKINGS SHALL BE PROVIDED, INSTALLED, MAINTAINED AND REMOVED BY THE PERMITTEE IN ACCORDANCE WITH THE MOST RECENT VERSION OF PART 6 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS (MUTCD). The central Permit Office entrance is via Vietnam Memorial Plaza between Water and South Streets. Projects requiring sidewalk closure may require additional permits. If repairs have not been made within the 75 day period, the City may make the repairs and bill the property owner for the cost of the repairs. Policies; Accessibility; About CT; At crossings, the height of Accessible Pedestrian Signals must be reachable by a person using a mobility device, at a preferred height of 42 inches and a maximum height of 48 inches (see, Existing foundations at traffic signal locations in certain flood-vulnerable areas are being replaced with coastal storm foundations that incorporate a square concrete pedestal raising the electrical components above some flood depths. For design criteria, technical information, finishes, and color specification, refer to DOTs Bureau of Traffic Operations, Division of Street Lighting specifications. OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO NORTH CURB LINE, OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO SOUTH CURB LINE, OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO EAST CURB LINE, OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO WEST CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO NORTH CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO SOUTH CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO EAST CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO WEST CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO NORTH CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO SOUTH CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO EAST CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO WEST CURB LINE.
Jamie Hinchliffe Parents,
Articles N